ANALISA DAYA DUKUNG PONDASI BORE PILE DI P-7 PADA PROYEK FLY OVER GANEVO MRANGGEN RUAS SEMARANG – GODONG ( KABUPATEN DEMAK )

Ari, Subandono (2022) ANALISA DAYA DUKUNG PONDASI BORE PILE DI P-7 PADA PROYEK FLY OVER GANEVO MRANGGEN RUAS SEMARANG – GODONG ( KABUPATEN DEMAK ). Masters thesis, UNDARIS.

[img] Text (TUGAS AKHIR BENTUK softcopy pdf)
Ari subandono.pdf - Submitted Version
Restricted to Registered users only

Download (3MB) | Request a copy
[img] Text (abstrak)
ABSTRAK.docx - Submitted Version
Restricted to Registered users only

Download (15kB) | Request a copy

Abstract

ABSTRAK Pondasi merupakan suatu pekerjaan yang sangat penting dalam suatu pekerjaan teknik sipil, karena pondasi inilah yang memikul dan menahan suatu beban yang bekerja diatasnya yaitu beban konstruksi atas. Tujuan dari studi ini untuk menghitung daya dukung tiang bor dari hasil sondir, standar penetrasi test (SPT), berdasarkan parameter kuat geser tanah. Kemudian membandingkan hasil daya dukung tiang bor, menghitung kapasitas kelompok ijin tiang dan menghitung penurunan yang terjadi pada tiang bor. Daya dukung bore pile diperoleh dari daya dukung ujung (end bearing capacity) yang diperoleh dari tekanan ujung tiang dan daya dukung geser atau selimut (friction bearing capacity) yang diperoleh dari daya dukung gesek atau gaya adhesi antara bore pile dan tanah disekelilingnya.Bore pile berinteraksi dengan tanah untuk menghasilkan daya dukung yang mampu memikul dan memberikan keamanan pada struktur atas. Untuk menghasilkan daya dukung yang akurat maka diperlukan suatu penyelidikan tanah yang akurat juga. Ada dua metode yang biasa digunakan dalam penentuan kapasitas daya dukung bore pile yaitu dengan menggunakan metode statis dan metode dinamis. Dari hasil perhitungan diketahui bahwa daya dukung ijin pondasi bore pile (Q ijin) : 60,507 ton, kapasitas daya dukung ijin pondasi (Qijin): 14,213 ton, daya dukung ujung pondasi bore pile pada tanah non kohesif adalah : 934.150 ton, daya dukung selimut bore pile pada tanah non kohesif adalah : 42.70 ton, Efisiensi kelompok tiang (Eg) : 0,588. Kapasitas kelompok ijin tiang (Qg) : 1. Perhitungan dengan Metode Aoki dan De Alencar = 213,46 ton 2. Perhitungan dengan Metode Meyerhof = 158,41 ton 3. Perhitungan dengan Metode Reese & Wright = 3295,6 ton 4. Kapasitas Kelompok ijin tiang dari Data Parameter Tanah = 512,35 ton ABSTRACT The foundation is a very important job in a civil engineering work, because it is this foundation that carries and holds a load that works on it, namely the top construction load. The purpose of this study is to calculate the bearing capacity of the drill pile from the results of sondir, standard penetration test (SPT), based on the parameters of the soil shear strength. Then compare the results of the bearing capacity of the drill pile, calculate the capacity of the pile permit group and calculate the settlement that occurs in the drill pile. The bearing capacity of the bore pile is obtained from the maximum end bearing capacity obtained from the pile tip pressure and the friction bearing capacity obtained from the friction bearing capacity or the adhesion force between the bore pile and the surrounding soil. The bore pile interacts with the soil to produce a bearing capacity capable of carrying and providing security to the superstructure. . To produce an accurate bearing capacity, an accurate soil investigation is also needed. There are two methods commonly used in determining the bearing capacity of the bore pile, namely by using the static method and the dynamic method. The results of the calculations bearing capacity of bore pile foundation permit (Q permit) : 60.507 tonne bearing capacity of foundation permit (Qijin): 14,213 tonne bearing capacity of bore pile foundation on non cohesive soil is : 934,150 ton bearing capacity of bore pile blanket on non cohesive soil is : 42.70 tons Pile group efficiency (Eg) : 0,588. Pile group capacity (Qg) : 1. Calculation by Aoki and De Alencar Method = 213.46 tons 2. Calculation by Meyerhof Method = 158.41 tons 3. Calculation by Reese & Wright Method = 3295.6 tons 4. Pile permit group capacity from Soil Parameter Data = 512.35 tons

Item Type: Thesis (Masters)
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Teknik > S1 Teknik Sipil
Depositing User: LIBRARY UNDARIS -
Date Deposited: 23 Dec 2022 06:11
Last Modified: 23 Dec 2022 06:11
URI: http://repository.undaris.ac.id/id/eprint/763

Actions (login required)

View Item View Item