ABSTRAK Embung Pusporenggo dibangun di Desa Pusporenggo, Kecamatan Musuk, Kabupaten Boyolali. Embung ini dibangun untuk memenuhi kebutuhan air baku di sekitar Desa Pusporenggo, Kecamatan Musuk, Kabupaten Boyolali pada saat musim kemarau datang. Perencanaan ulang ini dilakukan dengan pada data sekunder dengan data-data pendukung antara lain : data hujan, data klimatologi, data pengukuran embung, data geologi dan data tanah. Adapun analisa yang dilakukan antara lain : analisis luas DAS, analisis kebutuhan air baku, perhitungan volume embung dan stabilitas tubuh embung. Dari hasil analisa diperoleh luas DAS adalah 0.339 km² dengan panjang sungai 1.281 km. Volume sedimen : 15,083.61m³, Volume infiltrasi : 26,101.97m³, Volume evaporasi : 1,436.55m³, Volume kebutuhan air baku : 104,407.88m³. Dari perhitungan volume tersebut diketahui bahwa Embung Pusporenggo memerlukan volume embung sebesar : 147,030.00m³ dengan elevasi spillay pada + 498.5. Adapun dari desain awal, Embung Pusporenggo direncanakan dengan elevasi spillway pada +501.50 dan volume sebesar 234,532.60m³. Hal ini dikarenakan embung ini memaksimalkan cekungan bekas tambang yang sudah ada. Dapat disimpulkan bahwa embung ini masih bisa dimanfaatkan untuk pemenuhan kebutuhan air untuk desa lainya. Hasil perhitungan stabilitas dengan diperoleh nilai stabilitas pada saat kondisi air normal sebesar 1.750, kondisi embung kososng sebesar 1.465. Nilai keamanaan kontrol tersebut memenuhi syarat dan aman. Kata Kunci : Embung, Volume, Tubuh Embung, Stabilitas iv v ABSTRACT Pusporenggo Embung was built in Pusporenggo Village, Musuk District, Boyolali Regency. This reservoir was built to meet the needs of raw water around Pusporenggo Village, Musuk District, Boyolali Regency during the dry season. This re-planning is carried out using secondary data with supporting data, including: Rain data, climatological data, reservoir measurement data, geological data and soil data. The analyzes carried out include: analysis of watershed area, analysis of raw water needs, calculation of reservoir volume and reservoir stability. From the analysis, the watershed area is 0.339 km² with a river length of 1,281 km. Sediment volume : 15,083.61m³, Infiltration volume : 26,101.97m³, Evaporation volume : 1,436.55m, Volume of raw water requirement : 104,407.88m³. From the volume calculation, it is known that the Pusporenggo Reservoir requires a reservoir volume of: 147.030.00m³ with spillay elevation of + 498.5. As for the initial design, the Pusporenggo Embung is planned with a spillway elevation of +501.50 and a volume of 234.532.60m³. This is because this reservoir maximizes the existing ex-mining basin. It can be concluded that this reservoir can still be used to meet the water needs of other villages. The results of the calculation of stability obtained that the value of stability at normal water conditions was 1.750, while the reservoir was empty at 1.465. The security value of the control is qualified and safe. Keywords: Reservoir, Volume, Reservoir Body, Stability

Item Type: Thesis (Masters)
Subjects: Q Science > Q Science (General)
Divisions: Fakultas Teknik > S1 Teknik Sipil
Depositing User: NOVITA NOVITA RAHAYU
Date Deposited: 24 Nov 2022 06:16
Last Modified: 24 Nov 2022 06:16
URI: http://repository.undaris.ac.id/id/eprint/717

Actions (login required)

View Item View Item